RETURN

PERFO

Risk Control Project of Polluted Land of Jiangxi Hazardous Wastes Handling Center (EPC)

A project supervised by the fourth central environmental inspection group and an ecological  environment protection audit project of the Yangtze River Economic Belt.
Taking a comprehensive in-situ control measure of "horizontal barrier+vertical barrier around" to control the pollution sources generated by the original polluted land.